Multiple positions can be selected
In fact, there are many locations where the water separator can be installed, as long as the design is reasonable, for example, it can be designed into the bathroom, and the bathroom is provided with a waterproof layer. In case the running water problem occurs in manifold, the water can slide along the floor drain and it will not collapse. Secondly, the water separator also can be installed outdoors. The purpose of this installation is mainly to convenient for the maintenance during the later period. For example, on the balcony of the kitchen, if the leakage phenomenon turn can also be discharged through the floor drain.
Generally installed on the wall below the fireplace
The floor-heating manifold is generally installed on the wall below the wall-mounted boiler. The location requires to easy operation and is convenient for sewage disposal. Because the outlet water and the return water are set on each side, they must be staggered to a certain position, which is convenient for the matching of the outlet pipe and the return pipe on the same way. The height should be close to the ground, the installation should be firm and reliable, and it is not easy to be misplaced by other objects.
Warm water separator installation requirements
1. The manifold is installed on the wall and special use box, generally installed in the kitchen room;
2. The valve below the manifold should be more than 30cm away from the floor, installed horizontally;
3. The water supply valve is installed in front of the manifold, and the return valve is installed behind the manifold;
4. The filter is installed in front of the manifold;
5. Distributor connection sequence: connected to the main water supply pipe - lockable valve - filter - ball valve - three links (temperature, pressure gauge, interface) - manifold (upper bar) - geothermal pipe - water collector (the lower bar )—Ball valve—Connects to the water return pipe.